Hem-Consultant

How it Works

Step 1: Upload

Send your CAD or 2D drawing in STEP, IGES, STL, or PDF format.
You can also describe the part requirements and quantity.
We review files within 24 hours and confirm manufacturability.

Step 2: DFM Review

Design for Manufacturing (DFM) review identifies geometry, tolerance, and material concerns before production.
You receive clear feedback and an optimized quotation for material, process, and lead time.

Step 3: Manufacturing

Parts are produced by vetted suppliers in India under a controlled plan.
Operations include CNC machining, 3D printing, injection molding, and surface finishing.
Progress is tracked and documented.

Step 4: Inspection

Each batch is measured before dispatch.
A dimensional report and visual inspection photos are included.
Independent third-party inspectors are engaged when required for tight tolerance or certification-critical parts.

Step 5: Delivery

Finished parts are shipped from India to the EU via tracked logistics.
Air shipments: 3–6 days.
Sea shipments: 25–35 days.
Incoterms: DAP or DDP — single invoice in EUR for simplified customs and accounting.